{"id":53528,"date":"2014-10-30T20:40:22","date_gmt":"2014-10-30T20:40:22","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8428"},"modified":"2014-10-30T20:40:22","modified_gmt":"2014-10-30T20:40:22","slug":"region-solar-completes-1-mw-ground-mount-in-florida","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/region-solar-completes-1-mw-ground-mount-in-florida\/","title":{"rendered":"Region Solar Completes 1-MW Ground-Mount in Florida"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Region Solar has completed a 1.004-MW solar photovoltaic ground-mounted system at VizCo&rsquo;s 26,000 sqft. manufacturing facility in Monticello, Florida. This solar system is projected to produce 1,002,400 kWh of electricity annually, and will be net-metered by Duke Energy.&nbsp; The array will save 536 tons of CO2 from being emitted and<a href=\"http:\/\/solarbuildermag.com\/news\/region-solar-completes-1-mw-ground-mount-florida\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,12487,12496,2906,12497,9751],"class_list":["post-53528","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-modules","tag-mounting","tag-news","tag-project","tag-south"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/53528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=53528"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/53528\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=53528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=53528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=53528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}