{"id":539394,"date":"2020-02-18T20:40:29","date_gmt":"2020-02-18T20:40:29","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=27112"},"modified":"2020-02-18T20:40:29","modified_gmt":"2020-02-18T20:40:29","slug":"south-dakota-co-op-basin-electric-buys-large-scale-solar-generation-for-the-first-time-via-this-ppa","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/south-dakota-co-op-basin-electric-buys-large-scale-solar-generation-for-the-first-time-via-this-ppa\/","title":{"rendered":"South Dakota co-op Basin Electric buys large-scale solar generation for the first time via this PPA"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Geronimo Energy, a National Grid company, and Basin Electric Power Cooperative announced a Power Purchase Agreement (PPA) for the Wild Springs Solar Project. Wild Springs is a 128 megawatt (MW) clean solar energy project located in Pennington County, South Dakota, approximately 20 miles east of Rapid City. Wild Springs is<a href=\"https:\/\/solarbuildermag.com\/news\/south-dakota-co-op-basin-electric-buys-large-scale-solar-generation-for-the-first-time-via-this-ppa\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15352,13676,2906,9974,14140],"class_list":["post-539394","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-basin-electric","tag-municipal","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/539394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=539394"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/539394\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=539394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=539394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=539394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}