{"id":539689,"date":"2020-02-20T16:00:36","date_gmt":"2020-02-20T16:00:36","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=27147"},"modified":"2020-02-20T16:00:36","modified_gmt":"2020-02-20T16:00:36","slug":"kilovault-launches-wall-mounted-lithium-iron-energy-storage-tech-with-hab-series","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/kilovault-launches-wall-mounted-lithium-iron-energy-storage-tech-with-hab-series\/","title":{"rendered":"KiloVault launches wall-mounted lithium-iron energy storage tech with HAB series"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>KiloVault, a provider of innovative and affordable residential and commercial renewable energy solutions, this week unveiled the new HAB series of wall-mount energy storage systems. Designed for trouble-free mounting, the HAB provides a 7.5 kWh battery in a single unit. Up to 14 units can be wired in parallel to<a href=\"https:\/\/solarbuildermag.com\/energy-storage\/kilovault-launches-wall-mounted-lithium-iron-energy-storage-tech-with-hab-series\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,442,15346,2906,3000],"class_list":["post-539689","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-energy-storage","tag-kilovault","tag-news","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/539689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=539689"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/539689\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=539689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=539689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=539689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}