{"id":539819,"date":"2020-02-21T14:54:31","date_gmt":"2020-02-21T14:54:31","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=27165"},"modified":"2020-02-21T14:54:31","modified_gmt":"2020-02-21T14:54:31","slug":"array-technologies-debuts-a-single-bolt-clamp-to-speed-up-its-duratrack-installs-with-first-solar-modules","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/array-technologies-debuts-a-single-bolt-clamp-to-speed-up-its-duratrack-installs-with-first-solar-modules\/","title":{"rendered":"Array Technologies debuts a single-bolt clamp to speed up its DuraTrack installs with First Solar modules"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Array Technologies, market leaders in single-axis solar tracking, announced the launch of RapidClamp, a patent pending single-bolt PV module clamp technology that drastically decreases solar module installation times. &ldquo;The innovative RapidClamp greatly improves module installation times for EPCs installing First Solar Series 6 modules on DuraTrack single-axis solar trackers. It&rsquo;s<a href=\"https:\/\/solarbuildermag.com\/news\/array-technologies-debuts-a-single-bolt-clamp-to-speed-up-its-duratrack-installs-with-first-solar-modules\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13476,2189,12637,2906,3000,13050],"class_list":["post-539819","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-array-technologies-inc","tag-first-solar","tag-mounting-guide","tag-news","tag-products","tag-solar-trackers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/539819","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=539819"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/539819\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=539819"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=539819"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=539819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}