{"id":540710,"date":"2020-02-26T15:14:09","date_gmt":"2020-02-26T15:14:09","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=27246"},"modified":"2020-02-26T15:14:09","modified_gmt":"2020-02-26T15:14:09","slug":"united-renewable-energy-llc-builds-3-mw-solar-pv-project-for-nextera-georgia-power","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/united-renewable-energy-llc-builds-3-mw-solar-pv-project-for-nextera-georgia-power\/","title":{"rendered":"United Renewable Energy LLC builds 3-MW solar PV project for NextEra, Georgia Power"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>A 3 MW solar PV project has been completed and commercialized by United Renewable Energy at Kimberly-Clark&rsquo;s facility in LaGrange, Ga. The project was the result of collaboration between Kimberly-Clark&rsquo;s facility, United Renewable Energy LLC as the project developer and builder, and NextEra Energy Resources, LLC through a subsidiary, which<a href=\"https:\/\/solarbuildermag.com\/news\/united-renewable-energy-llc-builds-3-mw-solar-pv-project-for-nextera-georgia-power\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,57,9666],"tags":[2906,12930,9974,13414,15362],"class_list":["post-540710","post","type-post","status-publish","format-standard","hentry","category-georgia-leed-projects","category-leed-news","category-solar-power-energy","tag-news","tag-nextera-energy","tag-projects","tag-recs","tag-united-renewable-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/540710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=540710"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/540710\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=540710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=540710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=540710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}