{"id":541722,"date":"2020-03-02T16:03:18","date_gmt":"2020-03-02T16:03:18","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=27306"},"modified":"2020-03-02T16:03:18","modified_gmt":"2020-03-02T16:03:18","slug":"clenergy-passes-duns-registered-supplier-capability-evaluation-for-manufacturing","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/clenergy-passes-duns-registered-supplier-capability-evaluation-for-manufacturing\/","title":{"rendered":"Clenergy passes DUNS Registered Supplier Capability Evaluation for manufacturing"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar mounting and racking manufacturer Clenergy&nbsp;passed the Dun &amp; Bradstreet DUNS Registered Supplier Capability Evaluation (Manufacturing), rated at 5A1. The D&amp;B DUNS Number (which stands for&nbsp;data universal number system) is a unique nine-digit identifier for businesses that is&nbsp;used in dozens of countries around the world, including the U.S., Australia, and<a href=\"https:\/\/solarbuildermag.com\/mounting-solutions-guide\/clenergy-passes-duns-registered-supplier-capability-evaluation-for-manufacturing\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15153,12637,3000],"class_list":["post-541722","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-clenergy","tag-mounting-guide","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/541722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=541722"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/541722\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=541722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=541722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=541722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}