{"id":546967,"date":"2020-03-16T19:42:29","date_gmt":"2020-03-16T19:42:29","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=27571"},"modified":"2020-03-16T19:42:29","modified_gmt":"2020-03-16T19:42:29","slug":"solar-log-kitu-systems-collaborate-on-solar-plant-solutions-to-comply-with-california-rule-21-mandate","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-log-kitu-systems-collaborate-on-solar-plant-solutions-to-comply-with-california-rule-21-mandate\/","title":{"rendered":"Solar-Log, Kitu Systems collaborate on solar plant solutions to comply with California Rule 21 mandate"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar-Log and Kitu Systems are collaborating to offer expert solar plant monitoring, control and communication solutions that meet the new California&rsquo;s Rule 21 mandate. Starting on March 22, all smart inverters deployed with solar and energy storage installations in California are required to be capable of communications with the utility<a href=\"https:\/\/solarbuildermag.com\/news\/solar-log-kitu-systems-collaborate-on-solar-plant-solutions-to-comply-with-california-rule-21-mandate\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15367,15378,2906,3078,3000,14044,13867],"class_list":["post-546967","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters-and-ebos","tag-kitu-systems","tag-news","tag-om","tag-products","tag-rule-21","tag-solar-log"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/546967","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=546967"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/546967\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=546967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=546967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=546967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}