{"id":551334,"date":"2020-04-02T19:29:37","date_gmt":"2020-04-02T19:29:37","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=27811"},"modified":"2020-04-02T19:29:37","modified_gmt":"2020-04-02T19:29:37","slug":"good-news-maryland-just-made-it-easier-to-interconnect-solar-and-storage-to-the-grid","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/good-news-maryland-just-made-it-easier-to-interconnect-solar-and-storage-to-the-grid\/","title":{"rendered":"Good news: Maryland just made it easier to interconnect solar and storage to the grid"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Maryland Public Service Commission adopted updated rules this week for connecting distributed energy resources (such as solar and energy storage systems) to the electric grid. The updated rules will improve the efficiency of the interconnection process for customers and utilities, increase grid transparency, and enable a clearer pathway for<a href=\"https:\/\/solarbuildermag.com\/news\/good-news-maryland-just-made-it-easier-to-interconnect-solar-and-storage-to-the-grid\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,15007,13918,2906,4366],"class_list":["post-551334","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-grid-services","tag-irec","tag-news","tag-policy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/551334","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=551334"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/551334\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=551334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=551334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=551334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}