{"id":552468,"date":"2020-04-08T20:25:07","date_gmt":"2020-04-08T20:25:07","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=27849"},"modified":"2020-04-08T20:25:07","modified_gmt":"2020-04-08T20:25:07","slug":"longroad-energy-completes-financing-for-215-mw-little-bear-solar-projects","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/longroad-energy-completes-financing-for-215-mw-little-bear-solar-projects\/","title":{"rendered":"Longroad Energy completes financing for 215 MW Little Bear Solar Projects"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Longroad Energy, a US-based renewable energy developer, owner and operator, will be starting construction of Little Bear Solar, comprising four separate projects totaling 215 MWdc in Fresno County, Calif. Additionally, two Danish pension funds, PKA and PenSam, represented by their investment manager AIP, announced today that they are investing in<a href=\"https:\/\/solarbuildermag.com\/news\/longroad-energy-completes-financing-for-215-mw-little-bear-solar-projects\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,57,9666],"tags":[1590,15399,2906,9974,14140],"class_list":["post-552468","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-leed-news","category-solar-power-energy","tag-financing","tag-longroad-energy","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/552468","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=552468"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/552468\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=552468"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=552468"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=552468"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}