{"id":554390,"date":"2020-04-20T15:21:07","date_gmt":"2020-04-20T15:21:07","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28012"},"modified":"2020-04-20T15:21:07","modified_gmt":"2020-04-20T15:21:07","slug":"cps-america-adding-20a-rated-fuses-to-its-standard-large-scale-inverter-wire-boxes","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/cps-america-adding-20a-rated-fuses-to-its-standard-large-scale-inverter-wire-boxes\/","title":{"rendered":"CPS America adding 20A rated fuses to its standard large-scale inverter wire-boxes"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>As the solar PV industry moves toward larger module power generation capacities and short circuit current ratings, many PV system dc circuits now require 20A rated fuses. To meet this need, CPS is now producing its 100\/125kW standard wire-boxes with 20A fuses installed. This product improvement\/change will be effective for<a href=\"https:\/\/solarbuildermag.com\/products\/cps-america-adding-20a-rated-fuses-to-its-standard-large-scale-inverter-wire-boxes\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14380,15367,2906,3000],"class_list":["post-554390","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cps-america","tag-inverters-and-ebos","tag-news","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/554390","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=554390"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/554390\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=554390"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=554390"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=554390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}