{"id":555279,"date":"2020-04-23T17:25:06","date_gmt":"2020-04-23T17:25:06","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28104"},"modified":"2020-04-23T17:25:06","modified_gmt":"2020-04-23T17:25:06","slug":"solar-distancing-sizing-a-storage-system-based-on-an-energy-bill","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-distancing-sizing-a-storage-system-based-on-an-energy-bill\/","title":{"rendered":"Solar Distancing: Sizing a storage system based on an energy bill"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Sizing out a PV system is somewhat simple. Sizing the storage element to pair with it is much more nuanced and complex depending on whether the battery is just for backup (and how much back up) or for daily cycling (or both!) and what the ROI would be based on<a href=\"https:\/\/solarbuildermag.com\/solar-distancing\/solar-distancing-sizing-a-storage-system-based-on-an-energy-bill\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15164,4737,15230,2906,3000,5863,13095,15407],"class_list":["post-555279","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ebos","tag-featured","tag-generac","tag-news","tag-products","tag-pv-modules","tag-residential-solar","tag-solar-distancing-videos"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/555279","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=555279"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/555279\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=555279"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=555279"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=555279"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}