{"id":556557,"date":"2020-04-28T14:20:37","date_gmt":"2020-04-28T14:20:37","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28156"},"modified":"2020-04-28T14:20:37","modified_gmt":"2020-04-28T14:20:37","slug":"how-utility-contracts-are-halting-virginias-solar-expansion-in-some-rural-areas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/how-utility-contracts-are-halting-virginias-solar-expansion-in-some-rural-areas\/","title":{"rendered":"How utility contracts are halting Virginia\u2019s solar expansion in some rural areas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>From Energy News Network: By now, Denechia Edwards figured the rooftop of Ridgeview High School in southwest Virginia would be the highlight of a lesson about solar ingenuity deep in the heart of coal country.&nbsp;But the 700-kilowatt system proposed in 2018 is still on hold.&nbsp;That means no $10,000 annual savings<a href=\"https:\/\/solarbuildermag.com\/news\/how-utility-contracts-are-halting-virginias-solar-expansion-in-rural-areas\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,281],"tags":[2906,4366],"class_list":["post-556557","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-virginia","tag-news","tag-policy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/556557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=556557"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/556557\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=556557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=556557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=556557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}