{"id":559627,"date":"2020-05-12T12:00:16","date_gmt":"2020-05-12T12:00:16","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28299"},"modified":"2020-05-12T12:00:16","modified_gmt":"2020-05-12T12:00:16","slug":"10-structural-solar-mounting-problems-to-avoid-observed-by-pv-diagnostics","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/10-structural-solar-mounting-problems-to-avoid-observed-by-pv-diagnostics\/","title":{"rendered":"10 structural solar mounting problems to avoid, observed by PV Diagnostics"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>One of the most important factors while optimizing the cost of a solar power plant is Module Mounting Structure (MMS), which is a key ingredient in the successful running of a solar power plant. Most of the BoS components like transformers, inverter, cables, SCB, etc. are bought from the suppliers<a href=\"https:\/\/solarbuildermag.com\/mounting-solutions-guide\/10-structural-solar-mounting-problems-to-avoid-observed-by-pv-diagnostics\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[4737,14077,14368,12637,3078,15428,13050],"class_list":["post-559627","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-featured","tag-fixed-tilt","tag-installation","tag-mounting-guide","tag-om","tag-pv-diagnostics","tag-solar-trackers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/559627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=559627"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/559627\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=559627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=559627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=559627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}