{"id":559816,"date":"2020-05-13T13:15:10","date_gmt":"2020-05-13T13:15:10","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28323"},"modified":"2020-05-13T13:15:10","modified_gmt":"2020-05-13T13:15:10","slug":"1-billion-solar-battery-storage-project-in-nevada-gets-federal-approval","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/1-billion-solar-battery-storage-project-in-nevada-gets-federal-approval\/","title":{"rendered":"$1 billion solar, battery storage project in Nevada gets federal approval"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Bureau of Land Management (BLM) and the U.S. Department of the Interior (DOI) have issued the final Record of Decision for a $1.1 billion, 690 megawatt (MW) AC Gemini Solar + Battery Storage Project located in Clark County, Nevada. This Record of Decision formally concludes the federal authorization and<a href=\"https:\/\/solarbuildermag.com\/news\/1-billion-solar-battery-storage-project-in-nevada-gets-federal-approval\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974],"class_list":["post-559816","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/559816","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=559816"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/559816\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=559816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=559816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=559816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}