{"id":559829,"date":"2020-05-13T13:46:14","date_gmt":"2020-05-13T13:46:14","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28326"},"modified":"2020-05-13T13:46:14","modified_gmt":"2020-05-13T13:46:14","slug":"strata-solar-goes-with-teslas-megapack-for-this-100-mw-energy-storage-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/strata-solar-goes-with-teslas-megapack-for-this-100-mw-energy-storage-project\/","title":{"rendered":"Strata Solar goes with Tesla\u2019s Megapack for this 100-MW energy storage project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Renewable energy developer Strata Solar sent an update on its landmark Ventura Energy Storage (VES) project &mdash; a 100-MW, 400-MWh battery energy storage system in unincorporated Ventura County, Calif. Strata awarded an Engineering, Procurement and Construction (EPC) contract to Tesla for its Megapack battery system. Pre-construction development is now complete.<a href=\"https:\/\/solarbuildermag.com\/energy-storage\/strata-solar-goes-with-teslas-megapack-for-this-100-mw-energy-storage-project\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,2906,9974,13283,1281],"class_list":["post-559829","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-news","tag-projects","tag-strata-solar","tag-tesla"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/559829","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=559829"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/559829\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=559829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=559829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=559829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}