{"id":562726,"date":"2020-05-28T13:00:28","date_gmt":"2020-05-28T13:00:28","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28460"},"modified":"2020-05-28T13:00:28","modified_gmt":"2020-05-28T13:00:28","slug":"how-to-deliver-solar-safely-and-successfully-during-covid-19","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/how-to-deliver-solar-safely-and-successfully-during-covid-19\/","title":{"rendered":"How to deliver solar safely (and successfully) during COVID-19"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>In any scenario, the construction phase of a solar energy project brings with it a slew of logistical challenges and decision points for the delivery team. During the COVID-19 crisis, that list has understandably grown. COVID-19 has impacted all aspects of construction, both administrative and in the field. Where solar<a href=\"https:\/\/solarbuildermag.com\/news\/how-to-deliver-solar-safely-and-successfully-during-covid-19\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,4737,15215,2906,3078,13037],"class_list":["post-562726","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-featured","tag-interconnection","tag-news","tag-om","tag-sol-systems"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/562726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=562726"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/562726\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=562726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=562726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=562726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}