{"id":563627,"date":"2020-06-02T14:00:20","date_gmt":"2020-06-02T14:00:20","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28610"},"modified":"2020-06-02T14:00:20","modified_gmt":"2020-06-02T14:00:20","slug":"duke-energy-florida-names-next-three-solar-power-plant-locations-700-mw-total","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/duke-energy-florida-names-next-three-solar-power-plant-locations-700-mw-total\/","title":{"rendered":"Duke Energy Florida names next three solar power plant locations (700 MW total)"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Duke Energy Florida filed the locations of its three newest solar power plants this week. The Duette Solar Power Plant will be built on approximately 520 acres in Manatee County, Fla. Once operational, the 74.5-megawatt (MW) facility will consist of approximately 227,000 single-axis tracking solar panels, capable of producing enough<a href=\"https:\/\/solarbuildermag.com\/news\/duke-energy-florida-names-its-next-three-solar-power-plant-locations-700-mw-total\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2049,2906,9974],"class_list":["post-563627","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-duke-energy","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/563627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=563627"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/563627\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=563627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=563627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=563627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}