{"id":563855,"date":"2020-06-03T16:23:33","date_gmt":"2020-06-03T16:23:33","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28635"},"modified":"2020-06-03T16:23:33","modified_gmt":"2020-06-03T16:23:33","slug":"longroad-energy-selected-by-heco-to-develop-two-utility-scale-solar-storage-sites","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/longroad-energy-selected-by-heco-to-develop-two-utility-scale-solar-storage-sites\/","title":{"rendered":"Longroad Energy selected by HECO to develop two utility-scale solar, storage sites"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Longroad Energy was selected by Hawaiian Electric Company (HECO) to begin developing two utility-scale solar and battery storage projects for completion in 2023. The proposed projects include the 120 MWac\/480 MWh Mahi Solar in Kunia, O&rsquo;ahu, which would be the state&rsquo;s largest solar project to date, and the 40 MWac\/160<a href=\"https:\/\/solarbuildermag.com\/news\/longroad-energy-selected-by-heco-to-develop-two-utility-scale-solar-storage-sites\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15454,15399,2906,9974,14140],"class_list":["post-563855","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-heco","tag-longroad-energy","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/563855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=563855"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/563855\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=563855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=563855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=563855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}