{"id":567901,"date":"2020-06-23T15:42:42","date_gmt":"2020-06-23T15:42:42","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28881"},"modified":"2020-06-23T15:42:42","modified_gmt":"2020-06-23T15:42:42","slug":"largest-landfill-solar-storage-project-in-massachusetts-completed-by-cs-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/largest-landfill-solar-storage-project-in-massachusetts-completed-by-cs-energy\/","title":{"rendered":"Largest landfill solar + storage project in Massachusetts completed by CS Energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Integrated energy firm&nbsp;CS Energy completed a 4.5 MWdc solar project installed with a 3.8 MWh lithium-ion storage solution on a landfill cap site located in Amesbury, Mass. This massive solar-plus-storage system is part of a partnership between the City of Amesbury and Kearsarge Energy, a New England-based renewable energy developer<a href=\"https:\/\/solarbuildermag.com\/news\/largest-landfill-solar-storage-project-in-massachusetts-completed-by-cs-energy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15119,442,1424,2906,9974,14878],"class_list":["post-567901","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cs-energy","tag-energy-storage","tag-landfills","tag-news","tag-projects","tag-solar-storage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/567901","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=567901"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/567901\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=567901"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=567901"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=567901"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}