{"id":568265,"date":"2020-06-25T12:01:09","date_gmt":"2020-06-25T12:01:09","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=28914"},"modified":"2020-06-25T12:01:09","modified_gmt":"2020-06-25T12:01:09","slug":"resolving-complexities-in-a-landfill-community-solar-project-part-2-construction","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/resolving-complexities-in-a-landfill-community-solar-project-part-2-construction\/","title":{"rendered":"Resolving Complexities in a Landfill Community Solar Project, part 2: Construction"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Located on the outskirts of Beverly, Mass., in Essex County, the Beverly Community Solar Project was four and a half years in the making. Early challenges included waiting for an open incentive program that would make the project economically viable. In late 2018, Massachusetts introduced its new solar incentive program,<a href=\"https:\/\/solarbuildermag.com\/featured\/resolving-complexities-in-a-landfill-community-solar-project-part-2-construction-and-site-challenges\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14636,4737,12636,2906,9974,14004,13220],"class_list":["post-568265","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bluewave-solar","tag-featured","tag-landfill","tag-news","tag-projects","tag-signal-energy-construction","tag-solar-flexrack"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/568265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=568265"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/568265\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=568265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=568265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=568265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}