{"id":569547,"date":"2020-07-01T15:46:33","date_gmt":"2020-07-01T15:46:33","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29025"},"modified":"2020-07-01T15:46:33","modified_gmt":"2020-07-01T15:46:33","slug":"idemitsu-renewables-secures-71-million-in-tax-equity-for-solar-projects-in-california-colorado","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/idemitsu-renewables-secures-71-million-in-tax-equity-for-solar-projects-in-california-colorado\/","title":{"rendered":"Idemitsu Renewables secures $71 million in tax equity for solar projects in California, Colorado"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>This week, Idemitsu Renewables&nbsp;closed tax equity financing for its 50 MWp Central 40 solar project in Stanislaus County, California, and its 80 MWp Pioneer Solar project in Adams County, Colorado. Both projects are under construction and will begin operating in the fall of 2020. The tax equity syndicate was arranged<a href=\"https:\/\/solarbuildermag.com\/news\/idemitsu-renewables-secures-71-million-in-tex-equity-for-solar-projects-in-california-colorado\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[1590,15475,2906,9974],"class_list":["post-569547","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-financing","tag-idemitsu-renewables","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/569547","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=569547"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/569547\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=569547"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=569547"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=569547"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}