{"id":572311,"date":"2020-07-13T18:04:45","date_gmt":"2020-07-13T18:04:45","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29168"},"modified":"2020-07-13T18:04:45","modified_gmt":"2020-07-13T18:04:45","slug":"alabamas-largest-solar-project-sold-to-orsted-via-longroad-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/alabamas-largest-solar-project-sold-to-orsted-via-longroad-energy\/","title":{"rendered":"Alabama\u2019s largest solar project sold to \u00d8rsted via Longroad Energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Longroad Energy, a US-based renewable energy developer, closed the financing and sale of the Muscle Shoals Solar project, a 294 MW project located in Colbert County, Ala. &Oslash;rsted, the global renewable energy company, acquired the project at financial closing. Muscle Shoals Solar, the largest renewable energy project in Alabama, is<a href=\"https:\/\/solarbuildermag.com\/news\/alabamas-largest-solar-project-sold-to-orsted-via-longroad-energy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15399,2906,9974,14140],"class_list":["post-572311","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-longroad-energy","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/572311","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=572311"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/572311\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=572311"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=572311"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=572311"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}