{"id":574206,"date":"2020-07-21T18:55:16","date_gmt":"2020-07-21T18:55:16","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29310"},"modified":"2020-07-21T18:55:16","modified_gmt":"2020-07-21T18:55:16","slug":"empower-2020-virtual-summit-to-focus-on-solar-installer-growth-july-23","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/empower-2020-virtual-summit-to-focus-on-solar-installer-growth-july-23\/","title":{"rendered":"EMPOWER 2020 Virtual Summit to focus on solar installer growth (July 23)"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Just as the larger economy has started adapting to the COVID-19 pandemic, solar installers too are adjusting to doing business in the new normal, finding new ways to engage with customers, conduct remote site assessments, manage supply chain delays, navigate delayed solar permitting processes, etc. To help the solar community<a href=\"https:\/\/solarbuildermag.com\/news\/empower-2020-virtual-summit-to-focus-on-solar-installer-growth-july-23\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14276,2906,13095],"class_list":["post-574206","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-aurora-solar","tag-news","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/574206","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=574206"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/574206\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=574206"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=574206"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=574206"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}