{"id":576795,"date":"2020-08-04T15:37:51","date_gmt":"2020-08-04T15:37:51","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29509"},"modified":"2020-08-04T15:37:51","modified_gmt":"2020-08-04T15:37:51","slug":"georgia-power-launches-new-customer-connected-solar-program","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/georgia-power-launches-new-customer-connected-solar-program\/","title":{"rendered":"Georgia Power launches new Customer-Connected Solar Program"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Georgia Power continues to grow renewable energy through its new Customer-Connected Solar Program (CCSP), a 25-MW Distributed Generation customer-sited program. Working with the Georgia Public Service Commission on the program design, the Commissioners gave their approval in May 2020. Georgia Power will purchase 100% of the solar energy generated, directly<a href=\"https:\/\/solarbuildermag.com\/news\/georgia-power-launches-new-customer-connected-solar-program\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[811,15578,12888,2906,9974,13095,15579],"class_list":["post-576795","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-community-solar","tag-customer-connected-solar-program","tag-georgia-power","tag-news","tag-projects","tag-residential-solar","tag-simple-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/576795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=576795"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/576795\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=576795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=576795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=576795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}