{"id":5781,"date":"2011-12-13T00:00:00","date_gmt":"2011-12-13T00:00:00","guid":{"rendered":"http:\/\/leedpoints.com\/?guid=162111aee18897a7bb1d7481cdbfe5f0"},"modified":"2011-12-13T00:00:00","modified_gmt":"2011-12-13T00:00:00","slug":"solar-power-an-option-for-correctional-facilities","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-power-an-option-for-correctional-facilities\/","title":{"rendered":"Solar Power: An Option for Correctional Facilities?"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Merced Country contracted with Siemens group to deliver a 1.4 megawatt solar photovoltaic array to power the County&rsquo;s correctional facilities.&nbsp; The system is designed to provide approximately 70% of the facilities&rsquo; peak electricity consumption.<\/p>\n<p><a href=\"http:\/\/www.buildings.com\/ArticleDetails\/tabid\/3334\/ArticleID\/13305\/Default.aspx\">More&#8230;<\/a><\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[6802,6801,956,6800,232],"class_list":["post-5781","post","type-post","status-publish","format-standard","hentry","category-green-building-posts","tag-correctional-facilities","tag-photovoltaic-array","tag-siemens","tag-siemens-group","tag-solar-power"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/5781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=5781"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/5781\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=5781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=5781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=5781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}