{"id":579590,"date":"2020-08-17T16:19:12","date_gmt":"2020-08-17T16:19:12","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29663"},"modified":"2020-08-17T16:19:12","modified_gmt":"2020-08-17T16:19:12","slug":"paralleling-power-controls-onboard-vs-centrally-located","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/paralleling-power-controls-onboard-vs-centrally-located\/","title":{"rendered":"Paralleling power controls: onboard vs. centrally located"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Many facilities run several generators in parallel to ensure power reliability and guarantee sufficient emergency or backup power. Paralleling generators in this way improves reliability, increases load management flexibility, manages run time on engines and provides maintenance flexibility reducing generator costs. Synchronizing engine generators to a common bus, operators can<a href=\"https:\/\/solarbuildermag.com\/inverters\/bos\/paralleling-power-controls-onboard-vs-centrally-located\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15164,4737,15006,956],"class_list":["post-579590","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ebos","tag-featured","tag-russelectric","tag-siemens"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/579590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=579590"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/579590\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=579590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=579590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=579590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}