{"id":580351,"date":"2020-08-20T17:07:04","date_gmt":"2020-08-20T17:07:04","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29741"},"modified":"2020-08-20T17:07:04","modified_gmt":"2020-08-20T17:07:04","slug":"trina-solar-adds-another-7-6-gw-of-210-mm-solar-cell-production-capacity","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/trina-solar-adds-another-7-6-gw-of-210-mm-solar-cell-production-capacity\/","title":{"rendered":"Trina Solar adds another 7.6 GW of 210 mm solar cell production capacity"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Trina Solar signed an investment cooperation agreement with the Management Committee of Yancheng Economic and Technological Development Zone in Jiangsu province to expand its manufacturing capacity of 210 mm solar cells. The company&rsquo;s annual production capacity will reach 26 GW with 70 percent Ultra-High-Efficient 210mm cell by end of next<a href=\"https:\/\/solarbuildermag.com\/news\/trina-solar-adds-another-7-6-gw-of-210-mm-solar-cell-production-capacity\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,3000,5863,1635],"class_list":["post-580351","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-products","tag-pv-modules","tag-trina-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/580351","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=580351"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/580351\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=580351"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=580351"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=580351"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}