{"id":581169,"date":"2020-08-24T18:58:04","date_gmt":"2020-08-24T18:58:04","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29748"},"modified":"2020-08-24T18:58:04","modified_gmt":"2020-08-24T18:58:04","slug":"capital-dynamics-tenaska-plan-portfolio-of-nine-large-scale-energy-storage-systems-in-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/capital-dynamics-tenaska-plan-portfolio-of-nine-large-scale-energy-storage-systems-in-california\/","title":{"rendered":"Capital Dynamics, Tenaska plan portfolio of nine large-scale energy storage systems in California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Clean Energy Infrastructure business of Capital Dynamics&nbsp;signed an agreement with U.S. energy company Tenaska to develop a portfolio of nine battery energy storage system projects located throughout California&rsquo;s highest electrical load centers. The agreement expands the strategic relationship between the two companies, which jointly own two solar facilities in<a href=\"https:\/\/solarbuildermag.com\/news\/capital-dynamics-tenaska-plan-portfolio-of-nine-large-scale-energy-storage-systems-in-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,30,9666],"tags":[15638,15639,15195,15640,15641,2906,9974,15247,14140],"class_list":["post-581169","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-new-york-leed-projects","category-solar-power-energy","tag-bess","tag-caiso","tag-capital-dynamics","tag-clean-energy-infrastructure","tag-imperial-valley-california","tag-news","tag-projects","tag-tenaska","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/581169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=581169"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/581169\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=581169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=581169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=581169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}