{"id":581611,"date":"2020-08-26T18:53:49","date_gmt":"2020-08-26T18:53:49","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29837"},"modified":"2020-08-26T18:53:49","modified_gmt":"2020-08-26T18:53:49","slug":"leyline-provides-core-solar-with-capital-for-600-mw-of-utility-scale-solar-projects","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/leyline-provides-core-solar-with-capital-for-600-mw-of-utility-scale-solar-projects\/","title":{"rendered":"Leyline provides Core Solar with capital for 600 MW of utility-scale solar projects"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Leyline Renewable Capital, a provider of pre-construction capital for renewable energy, signed a deal with Core Solar LLC, to provide development-stage capital for 600 MW of utility-scale solar projects representing a portion of Core Solar&rsquo;s pipeline across the United States. &ldquo;Projects like these are the backbone of the next-generation clean<a href=\"https:\/\/solarbuildermag.com\/news\/leyline-provides-core-solar-with-capital-for-600-mw-of-utility-scale-solar-projects\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,79,9666],"tags":[15649,15250,2906,9974],"class_list":["post-581611","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-north-carolina-leed-projects","category-solar-power-energy","tag-core-solar-llc","tag-leyline-renewable-capital","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/581611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=581611"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/581611\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=581611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=581611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=581611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}