{"id":581827,"date":"2020-08-27T15:54:13","date_gmt":"2020-08-27T15:54:13","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29833"},"modified":"2020-08-27T15:54:13","modified_gmt":"2020-08-27T15:54:13","slug":"longroad-energy-finances-331-mw-prospero-2-solar-project-includes-two-ppas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/longroad-energy-finances-331-mw-prospero-2-solar-project-includes-two-ppas\/","title":{"rendered":"Longroad Energy finances 331-MW Prospero 2 solar project, includes two PPAs"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Longroad Energy Holdings, a US-based renewable energy developer, owner and operator, announced the financial close and commencement of construction of the Prospero 2 Solar Project, a 331 megawatt direct current project located in Andrews County, TX. Longroad will manage construction as well as continue to own the $320 million project,<a href=\"https:\/\/solarbuildermag.com\/news\/longroad-energy-finances-331-mw-prospero-2-solar-project-includes-two-ppas\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,81],"tags":[2189,15399,2906,13010,13057,9974,15653,13050,13355],"class_list":["post-581827","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-texas-leed-projects","tag-first-solar","tag-longroad-energy","tag-news","tag-nextracker","tag-power-electronics","tag-projects","tag-prospero-2","tag-solar-trackers","tag-swinerton-renewable-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/581827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=581827"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/581827\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=581827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=581827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=581827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}