{"id":582779,"date":"2020-08-31T15:34:56","date_gmt":"2020-08-31T15:34:56","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29888"},"modified":"2020-08-31T15:34:56","modified_gmt":"2020-08-31T15:34:56","slug":"candela-renewables-signs-ppa-with-google-for-texas-solar-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/candela-renewables-signs-ppa-with-google-for-texas-solar-project\/","title":{"rendered":"Candela Renewables signs PPA with Google for Texas solar project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Utility-scale solar developer Candela Renewables announced an agreement with Google for a 140-MW power purchase agreement (PPA) in Texas. This agreement is a part of Google&rsquo;s biggest renewable energy purchase ever, announced by them in September 2019, which is also the largest-ever corporate purchase of renewable power &ndash; overall, a<a href=\"https:\/\/solarbuildermag.com\/news\/candela-renewables-signs-ppa-with-google-for-texas-solar-project\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,81],"tags":[15657,1590,479,2906,9974],"class_list":["post-582779","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-texas-leed-projects","tag-candela-renewables","tag-financing","tag-google","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/582779","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=582779"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/582779\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=582779"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=582779"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=582779"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}