{"id":583143,"date":"2020-09-02T12:40:13","date_gmt":"2020-09-02T12:40:13","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=29915"},"modified":"2020-09-02T12:40:13","modified_gmt":"2020-09-02T12:40:13","slug":"enel-green-power-starts-operations-on-largest-solar-plant-in-texas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/enel-green-power-starts-operations-on-largest-solar-plant-in-texas\/","title":{"rendered":"Enel Green Power starts operations on largest solar plant in Texas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Enel Green Power started operations at the second phase of its Roadrunner solar plant in Upton County, Texas (245 MW). The overall 497 MW project is the largest operational solar farm in Texas and the company&rsquo;s largest in the United States. The plant&rsquo;s 1.2 million bifacial photovoltaic (PV) panels will<a href=\"https:\/\/solarbuildermag.com\/news\/enel-green-power-starts-operations-on-largest-solar-plant-in-texas\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,81],"tags":[2260,2906,9974,14140],"class_list":["post-583143","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-texas-leed-projects","tag-enel-green-power","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/583143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=583143"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/583143\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=583143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=583143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=583143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}