{"id":587919,"date":"2020-09-23T17:31:01","date_gmt":"2020-09-23T17:31:01","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=30261"},"modified":"2020-09-23T17:31:01","modified_gmt":"2020-09-23T17:31:01","slug":"anthem-signs-solar-ppa-with-sunenergy1-as-it-moves-to-100-percent-renewable-energy-by-2025","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/anthem-signs-solar-ppa-with-sunenergy1-as-it-moves-to-100-percent-renewable-energy-by-2025\/","title":{"rendered":"Anthem signs solar PPA with SunEnergy1 as it moves to 100 percent renewable energy by 2025"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>In 2019, Anthem, Inc. made the commitment to invest in and source 100 percent renewable energy by 2025. Now, as a key step in that strategy, Anthem has signed a 15-year power purchase agreement with SunEnergy1, a U.S. solar developer, owner and operator of utility-scale solar projects. The agreement is<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/anthem-signs-solar-ppa-with-sunenergy1-as-it-moves-to-100-percent-renewable-energy-by-2025\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,79,9666],"tags":[15739,13203,1590,15740,2906,9974,15741,15742],"class_list":["post-587919","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-north-carolina-leed-projects","category-solar-power-energy","tag-anthem-inc","tag-commercial","tag-financing","tag-hanover-county","tag-news","tag-projects","tag-richmond-virginia","tag-sunenergy1"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/587919","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=587919"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/587919\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=587919"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=587919"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=587919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}