{"id":589163,"date":"2020-09-28T14:39:32","date_gmt":"2020-09-28T14:39:32","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=30323"},"modified":"2020-09-28T14:39:32","modified_gmt":"2020-09-28T14:39:32","slug":"alencon-systems-adds-fused-electrical-disconnect-option-to-dcdc-converter-line","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/alencon-systems-adds-fused-electrical-disconnect-option-to-dcdc-converter-line\/","title":{"rendered":"Alencon Systems adds fused electrical disconnect option to DC:DC converter line"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Alencon Systems LLC has launched a new installation option (and acronym!) that will make its BOSS and SPOT lines of galvanically isolated DC:DC converters even more flexible. The FEED \u2013 or fused electrical disconnect \u2013 is installed with a SPOT or BOSS device in the factory that allows for a<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/alencon-systems-adds-fused-electrical-disconnect-option-to-dcdc-converter-line\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14088,15442,15164,14246,2906,3000],"class_list":["post-589163","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-alencon-systems","tag-dc-converters","tag-ebos","tag-large-scale","tag-news","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/589163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=589163"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/589163\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=589163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=589163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=589163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}