{"id":591190,"date":"2020-10-06T13:48:03","date_gmt":"2020-10-06T13:48:03","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=30427"},"modified":"2020-10-06T13:48:03","modified_gmt":"2020-10-06T13:48:03","slug":"rapid-shutdown-option-to-know-imo-fireraptor-receives-ul-pvrss-listing-with-fronius","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/rapid-shutdown-option-to-know-imo-fireraptor-receives-ul-pvrss-listing-with-fronius\/","title":{"rendered":"Rapid Shutdown option to know: IMO FireRaptor receives UL PVRSS Listing with Fronius"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>IMO Automation tells us its FireRaptor received UL PVRSS (Photovoltaic Rapid Shutdown System) listing on the Fronius Primo family of solar inverters under UL1741 guidelines. IMO Automation worked closely with Fronius in achieving this listing as it required the development of an additional capacitance bleed circuit to dispel stored current<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/products\/rapid-shutdown-option-to-know-imo-fireraptor-receives-ul-pvrss-listing-with-fronius\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15772,13529,15367,14418,2906,3000,5863],"class_list":["post-591190","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-fireraptor","tag-fronius","tag-inverters-and-ebos","tag-nec-2017","tag-news","tag-products","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/591190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=591190"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/591190\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=591190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=591190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=591190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}