{"id":593117,"date":"2020-10-14T15:35:31","date_gmt":"2020-10-14T15:35:31","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=30486"},"modified":"2020-10-14T15:35:31","modified_gmt":"2020-10-14T15:35:31","slug":"sunpin-solar-finds-ppa-offtaker-for-full-output-of-the-titan-solar-1-power-plant","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunpin-solar-finds-ppa-offtaker-for-full-output-of-the-titan-solar-1-power-plant\/","title":{"rendered":"Sunpin Solar finds PPA offtaker for full output of the Titan Solar 1 Power Plant"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Sunpin Solar, a California-based solar developer, announced a renewable energy power purchase agreement with an investment grade offtaker for the full output of the Titan Solar 1 Power Plant, which began construction in January 2020. The renewable energy PPA covers the full 98 megawatt direct current power capacity of the<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/sunpin-solar-finds-ppa-offtaker-for-full-output-of-the-titan-solar-1-power-plant\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,57,9666],"tags":[15786,2906,13429,9974,15053,14140],"class_list":["post-593117","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-leed-news","category-solar-power-energy","tag-imperial-county","tag-news","tag-ppa","tag-projects","tag-sunpin-solar","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/593117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=593117"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/593117\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=593117"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=593117"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=593117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}