{"id":593142,"date":"2020-10-14T16:35:56","date_gmt":"2020-10-14T16:35:56","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=30510"},"modified":"2020-10-14T16:35:56","modified_gmt":"2020-10-14T16:35:56","slug":"barrette-outdoor-living-adds-over-2-mw-of-solar-power-at-florida-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/barrette-outdoor-living-adds-over-2-mw-of-solar-power-at-florida-facility\/","title":{"rendered":"Barrette Outdoor Living adds over 2 MW of solar power at Florida facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Barrette Outdoor Living has completed the installation of a rooftop solar array on their 200,000 square foot aluminum fence and railing manufacturing facility in Brooksville, Florida, making it the largest privately-owned solar project in Florida at the time of contract. The 2.35 megawatt direct current system was designed and installed<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/barrette-outdoor-living-adds-over-2-mw-of-solar-power-at-florida-facility\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13279,15794,15795,13203,15796,15797,15798,2906,9974],"class_list":["post-593142","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-advanced-green-technologies","tag-barrette-outdoor-living","tag-brooksville-florida","tag-commercial","tag-duke-energy-florida","tag-fort-lauderdale","tag-galloway-nj","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/593142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=593142"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/593142\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=593142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=593142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=593142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}