{"id":596122,"date":"2020-10-26T15:43:14","date_gmt":"2020-10-26T15:43:14","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=30658"},"modified":"2020-10-26T15:43:14","modified_gmt":"2020-10-26T15:43:14","slug":"ratedpower-automates-engineering-of-substations-for-utility-scale-solar-in-pvdesign","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ratedpower-automates-engineering-of-substations-for-utility-scale-solar-in-pvdesign\/","title":{"rendered":"RatedPower automates engineering of substations for utility-scale solar in pvDesign"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>To connect a solar PV plant to distribution or transmission networks, it is necessary to step-up the voltage level from medium to high voltage, which usually means a substation. Substations are used to accommodate new energy generation, maintain reliability requirements to address congestion in the power grids, satisfy load growth<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/ratedpower-automates-engineering-of-substations-for-utility-scale-solar-in-pvdesign\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,3000,15550,12833,14140],"class_list":["post-596122","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-products","tag-ratedpower","tag-software","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/596122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=596122"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/596122\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=596122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=596122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=596122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}