{"id":596126,"date":"2020-10-26T16:26:02","date_gmt":"2020-10-26T16:26:02","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=30665"},"modified":"2020-10-26T16:26:02","modified_gmt":"2020-10-26T16:26:02","slug":"trina-solar-is-first-solar-module-manufacturer-to-earn-iec-62941-from-tuv-rheinland","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/trina-solar-is-first-solar-module-manufacturer-to-earn-iec-62941-from-tuv-rheinland\/","title":{"rendered":"Trina Solar is first solar module manufacturer to earn IEC 62941 from T\u00dcV Rheinland"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Trina Solar received the world\u2019s first IEC 62941:2019 certification for their photovoltaic module manufacturing quality system issued by T\u00dcV Rheinland. IEC 62941 is the only quality system management standard in the photovoltaic industry. What\u2019s this mean? Compared with ISO9001, it is more specific to the photovoltaic industry. It is a<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/trina-solar-earns-solar-pv-certification-from-tuv-rheinland\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,3000,5863,14033,13391],"class_list":["post-596126","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-products","tag-pv-modules","tag-trinasolar","tag-tuv-rheinland"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/596126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=596126"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/596126\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=596126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=596126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=596126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}