{"id":601056,"date":"2020-11-17T13:13:26","date_gmt":"2020-11-17T13:13:26","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=31005"},"modified":"2020-11-17T13:13:26","modified_gmt":"2020-11-17T13:13:26","slug":"cypress-creek-cubico-solar-project-wagyu-turns-on-in-brazoria-county-texas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/cypress-creek-cubico-solar-project-wagyu-turns-on-in-brazoria-county-texas\/","title":{"rendered":"Cypress Creek, Cubico solar project, Wagyu, turns on in Brazoria County, Texas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The 162-MW Wagyu solar PV project in Brazoria County, Texas, is now delivering power to the grid. Located near Houston, the project is owned by Cubico Sustainable Investments and was developed by Cypress Creek Renewables.\u00a0Project construction was performed by RES (Renewable Energy Systems). In addition to acting as the original<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/cypress-creek-cubico-solar-project-wagyu-turns-on-in-brazoria-county-texas\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13835,2906,9974,14140],"class_list":["post-601056","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cypress-creek-renewables","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/601056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=601056"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/601056\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=601056"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=601056"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=601056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}