{"id":601511,"date":"2020-11-19T14:00:21","date_gmt":"2020-11-19T14:00:21","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=31051"},"modified":"2020-11-19T14:00:21","modified_gmt":"2020-11-19T14:00:21","slug":"altus-power-acquires-2-5-megawatt-operating-solar-project-in-vermont","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/altus-power-acquires-2-5-megawatt-operating-solar-project-in-vermont\/","title":{"rendered":"Altus Power acquires 2.5-megawatt operating solar project in Vermont"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Altus Power America\u00a0completed the acquisition of a 2.5-MW operating solar project in Charlotte, Vermont. The acquired project generates approximately 3 million kWh of electricity annually.\u00a0This project sells energy to VEPP, Inc, a not-for-profit Vermont Corporation that administers two of Vermont\u2019s Renewable Energy Programs under contract with the Vermont Public Utility<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/altus-power-acquires-2-5-megawatt-operating-solar-project-in-vermont\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14735,2906,9974,15904,863],"class_list":["post-601511","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-altus-power-america","tag-news","tag-projects","tag-vepp","tag-vermont"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/601511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=601511"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/601511\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=601511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=601511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=601511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}