{"id":601548,"date":"2020-11-19T15:00:08","date_gmt":"2020-11-19T15:00:08","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=30969"},"modified":"2020-11-19T15:00:08","modified_gmt":"2020-11-19T15:00:08","slug":"ferc-order-841-mattered-but-state-interconnection-rules","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ferc-order-841-mattered-but-state-interconnection-rules\/","title":{"rendered":"FERC Order 841 mattered, but state interconnection rules"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>It was big news this summer when a federal appeals court upheld Order 841 of the Federal Energy Regulatory Commission. FERC Order 841 clarified that energy storage systems as small as 100 kW (which are interconnected on the distribution grid, under state rules), cannot be barred from participating in wholesale<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/featured\/ferc-order-841-mattered-but-state-interconnection-rules\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[4737,12902,13235,15215,13918,2906,4366,6457],"class_list":["post-601548","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-featured","tag-ferc","tag-grid-management","tag-interconnection","tag-irec","tag-news","tag-policy","tag-storage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/601548","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=601548"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/601548\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=601548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=601548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=601548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}