{"id":604505,"date":"2020-12-02T14:49:51","date_gmt":"2020-12-02T14:49:51","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=31135"},"modified":"2020-12-02T14:49:51","modified_gmt":"2020-12-02T14:49:51","slug":"ameresco-completes-solar-installation-on-foothill-landfill-in-san-joaquin-county-calif","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ameresco-completes-solar-installation-on-foothill-landfill-in-san-joaquin-county-calif\/","title":{"rendered":"Ameresco completes solar installation on Foothill Landfill in San Joaquin County, Calif."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Ameresco\u00a0completed construction on a 5.3-MW direct current ground-mount solar energy system at San Joaquin County, California\u2019s Foothill Landfill. This is Ameresco\u2019s second renewable energy project with the County and will help reduce their utility costs through California\u2019s Renewable Energy Self-Generation Bill Credit Transfer program. \u201cSan Joaquin County, and it\u2019s local<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/ameresco-completes-solar-installation-on-foothill-landfill-in-san-joaquin-county-calif\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,57,9666],"tags":[15933,1282,15934,15935,2906,3492,9974,15764,15936],"class_list":["post-604505","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-leed-news","category-solar-power-energy","tag-alifornias-renewable-energy-self-generation-bill-credit-transfer","tag-ameresco","tag-foothill-landfill","tag-linden","tag-news","tag-pge","tag-projects","tag-sage-energy-consulting","tag-san-joaquin-county"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/604505","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=604505"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/604505\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=604505"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=604505"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=604505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}