{"id":607294,"date":"2020-12-14T20:03:33","date_gmt":"2020-12-14T20:03:33","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=31366"},"modified":"2020-12-14T20:03:33","modified_gmt":"2020-12-14T20:03:33","slug":"seraphim-expands-half-cell-module-production-with-factory-in-vietnam","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/seraphim-expands-half-cell-module-production-with-factory-in-vietnam\/","title":{"rendered":"Seraphim expands half-cell module production with factory in Vietnam"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Seraphim Solar System Co. is expanding its capacity, investing in a 750-MW module assembly factory with fully automatic production lines in Vietnam. This move will enhance Vietnam\u2019s enterprise resilience in the face of the pandemic by strengthening its global supply capability, using Seraphim\u2019s 500 MW S3 series half-cell modules and<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/seraphim-expands-half-cell-module-production-with-factory-in-vietnam\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,3000,5863,14877],"class_list":["post-607294","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-products","tag-pv-modules","tag-seraphim"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/607294","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=607294"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/607294\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=607294"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=607294"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=607294"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}