{"id":608956,"date":"2020-12-21T17:13:24","date_gmt":"2020-12-21T17:13:24","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=31416"},"modified":"2020-12-21T17:13:24","modified_gmt":"2020-12-21T17:13:24","slug":"sma-america-hits-1-gw-of-sunny-central-storage-inverters-in-north-america","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sma-america-hits-1-gw-of-sunny-central-storage-inverters-in-north-america\/","title":{"rendered":"SMA America hits 1 GW of Sunny Central Storage inverters in North America"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SMA America has reached an impressive milestone in battery storage, having sold a cumulative 1 GW (gigawatt) of Sunny Central Storage inverters in North America. No small feat, SMA has worked alongside some of the world\u2019s largest storage integrators to reach this landmark achievement. SMA solutions are currently installed on<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/energy-storage\/sma-america-hits-1-gw-of-sunny-central-storage-inverters-in-north-america\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15367,2906,3000,13436,6457,14140],"class_list":["post-608956","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters-and-ebos","tag-news","tag-products","tag-sma-america","tag-storage","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/608956","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=608956"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/608956\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=608956"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=608956"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=608956"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}