{"id":614106,"date":"2021-01-13T20:42:49","date_gmt":"2021-01-13T20:42:49","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=31589"},"modified":"2021-01-13T20:42:49","modified_gmt":"2021-01-13T20:42:49","slug":"largest-on-site-craft-brewery-solar-project-now-live-via-duke-energy-rec-solar","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/largest-on-site-craft-brewery-solar-project-now-live-via-duke-energy-rec-solar\/","title":{"rendered":"Largest on-site craft brewery solar project now live via Duke Energy, REC Solar"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Duke Energy and Firestone Walker Brewing Co. have completed one of the largest on-site solar arrays in the craft beer industry \u00ad\u00ad\u00ad\u2013 a 2.1-megawatt solar array and 281-kilowatt solar carport on 9.7 acres in Paso Robles, Calif.\u00a0The arrays will generate the majority of the brewery\u2019s energy, which is enough to<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/largest-on-site-craft-brewery-solar-project-now-live-via-duke-energy-rec-solar\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13644,13203,2049,16026,2906,9974],"class_list":["post-614106","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-carports","tag-commercial","tag-duke-energy","tag-firestone-walker","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/614106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=614106"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/614106\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=614106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=614106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=614106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}