{"id":615765,"date":"2021-01-19T16:15:11","date_gmt":"2021-01-19T16:15:11","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=31617"},"modified":"2021-01-19T16:15:11","modified_gmt":"2021-01-19T16:15:11","slug":"joliet-junior-college-adds-solar-array-to-power-22-percent-of-the-campus-via-pivot-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/joliet-junior-college-adds-solar-array-to-power-22-percent-of-the-campus-via-pivot-energy\/","title":{"rendered":"Joliet Junior College adds solar array to power 22 percent of the campus via Pivot Energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Pivot Energy and Joliet Junior College in Illinois (JJC) have completed and activated the 1.3-megawatt onsite solar system at JJC\u2019s Main Campus. The solar array, with 3,542 solar panels, was installed by national solar developer Pivot Energy and will save the college more than $1.6 million in electricity expenses over<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/joliet-junior-college-adds-solar-array-to-power-22-percent-of-the-campus-via-pivot-energy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,16036,2906,15199,9974,2155,16037],"class_list":["post-615765","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-joliet-junior-college","tag-news","tag-pivot-energy","tag-projects","tag-schools","tag-sunlarge-industries"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/615765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=615765"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/615765\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=615765"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=615765"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=615765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}