{"id":620042,"date":"2021-02-03T21:44:36","date_gmt":"2021-02-03T21:44:36","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=31909"},"modified":"2021-02-03T21:44:36","modified_gmt":"2021-02-03T21:44:36","slug":"how-to-ensure-your-solar-components-werent-sourced-from-xinjiang-or-involved-forced-labor","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/how-to-ensure-your-solar-components-werent-sourced-from-xinjiang-or-involved-forced-labor\/","title":{"rendered":"How to ensure your solar components weren\u2019t sourced from Xinjiang or involved forced labor"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>This was originally published by the Clean Energy Associates. In recent weeks and months there has been a lot of press and discussion about the ethical sourcing of PV modules, specifically whether the solar industry is somehow tied to the use of forced labor. Since the 1930\u2019s Tariff Act, the<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/how-to-ensure-your-solar-components-werent-sourced-from-xinjiang-or-involved-forced-labor\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16086,15460,4737,2906,3000,5863,7124,14140],"class_list":["post-620042","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cea","tag-clean-energy-associates","tag-featured","tag-news","tag-products","tag-pv-modules","tag-supply-chain","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/620042","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=620042"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/620042\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=620042"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=620042"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=620042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}