{"id":625064,"date":"2021-02-22T15:18:48","date_gmt":"2021-02-22T15:18:48","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=32204"},"modified":"2021-02-22T15:18:48","modified_gmt":"2021-02-22T15:18:48","slug":"three-wire-management-tips-for-residential-solar-installers","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/three-wire-management-tips-for-residential-solar-installers\/","title":{"rendered":"Three wire management tips for residential solar installers"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>As part of our Wire and Cable Management Buyer\u2019s Guide, we asked manufacturers for some installation tips. Here is what they had to say. Working off the roof. Installers are still doing most of the wire management assembly once they are up on the roof. We have seen several installers<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/three-wire-management-tips-for-residential-solar-installers\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15164,4737,14898,14134,2906,13095,15108,13601],"class_list":["post-625064","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ebos","tag-featured","tag-hellermanntyton","tag-heyco","tag-news","tag-residential-solar","tag-staubli-electrical-connectors","tag-wire-management"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/625064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=625064"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/625064\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=625064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=625064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=625064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}