{"id":627234,"date":"2021-03-02T18:52:53","date_gmt":"2021-03-02T18:52:53","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=32422"},"modified":"2021-03-02T18:52:53","modified_gmt":"2021-03-02T18:52:53","slug":"q-cells-develops-then-sells-rippey-solar-project-texas-to-adapture-renewables","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/q-cells-develops-then-sells-rippey-solar-project-texas-to-adapture-renewables\/","title":{"rendered":"Q CELLS develops then sells Rippey Solar project (Texas) to Adapture Renewables"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Adapture Renewables Inc. acquired Rippey Solar this week, an 81-MW solar project in Cooke County, Texas, from Hanwha Q CELLS USA Corp. Construction of the project, located 90 miles north of Dallas, began in April and the project achieved commercial operation in December 2020. The project highlights Q CELLS\u2019 strength<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/q-cells-develops-then-sells-rippey-solar-project-texas-to-adapture-renewables\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16112,15048,2906,9974,5863],"class_list":["post-627234","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-adapture-renewables","tag-hanwha-q-cells","tag-news","tag-projects","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/627234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=627234"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/627234\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=627234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=627234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=627234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}